Navia River Viaduct, Asturias
Year of Completion 2006
by
pwdale25
—
last modified
Thu, 19 Aug 2010
Inaugurated in June 2006, the Navia River Viaduct is made up of 2 x 160m central spans held up by 2 arches built on a prestressed deck. The arches consist of a metallic box filled with concrete; their anchorages are connected to the deck using 84 x 40 dia Macalloy 835 x 1030 pre-stressing bars. BBR PTE in Spain carried out the inspection and stressing.