Macalloy Post Tensioning Bar Used to Anchor Temporary Supports for Milau Viaduct, France



Macalloy Post Tension Bars system was used as a temporary re-inforcement measure during the construction of the Milau Viaduct in France.

During construction the Milau viaduct in France required temporary steel column supports to support the bridge during the process of installing the cable stay hangers.

The steel column supports were anchored to the ground using the Macalloy post tension bar. The columns were place between the cable hanger towers for support, The Macalloy PT bar provided a high strength anchor bolt.  

 

Architect - Fosters and Partners

Contractor - Eiffage

Engineer – Michel Virologeux, Bureau d’études Greisch, Setec

You can book a presentation online here..

Required
Required
Required
Required
Required

LATEST NEWS

pic.jpg

Australia 108, Melbourne, Australia

Australia 108, planned for construction at 70 Southbank Boulevard, Southbank, Victoria, will be the first 100 storey residential apartment building in the southern hemisphere. Macalloy is providing a total of 203 tonnes of 1030 steel bar in 75mm fully threaded. 

LATEST PROJECTS

VTB Web 2.png

VTB Arena, Moscow Russia

Work is well under way at the VTB Arena - also known as Dynamo Central Stadium. Macalloy have provided galvanised 520 Grade Tension Rods in M16, M85 and M100. Work is expected to be completed later on this year, ready to host FIFA 2018 World Cup. Macalloy is also supplying Tension Rods to 4 other Russian Stadiums/Arena's - again these venues will be hosting the 2018 World Cup.

 

PRODUCTS & SERVICES

P1090266.JPG

Site Services

Macalloy can provide support for installation and stressing of all our products. Site services support includes equipment hire, training of site personnel to install and tension bars and on site installation.

Find out more