Sheikh Zayed Bridge, Abu Dhabi — Tension Bars/Tie Rods/ Tie Bars/Post Tensioning Bars - Macalloy Website
Personal tools
You are here: Home > Projects > Sheikh Zayed Bridge, Abu Dhabi

Sheikh Zayed Bridge, Abu Dhabi

Sheikh Zayed Bridge, Contract 3, Abu Dhabi

Year of Completion 2010

by pwdale25 — last modified Fri, 08 Apr 2011

Construction of a 912m long bridge linking Abu Dhabi with the mainland has a central span of 234m. The main bridge is a hybrid structure, consisting of central steel asymmetric arch ribs supporting pre-stressed concrete box girder decks. At the two main channel piers, the decks are supported by inclined pre-stressed concrete supports, rising vertically from the pier pile caps.

The steel arch segments were designed with end-bolted connections, using 75mm Macalloy bars.

Architect - Zaha Hadid Architects

Contractor - Archirodon Construction (O) Co. S.A.

Engineer - High Point Rendel, London

<<   Page 1 of 11   >>