Trinec-Baliny Bridge
Year of Completion 2009
by
pwdale25
—
last modified
Wed, 07 Apr 2010
Careful technical and organisational preperation was required to minimise the time needed for closure on the railway track located under the bridge. Macalloy 520 tie rods in M56 and M64 diameter were erected and prestressed on site by Tension Structures, s.r.o using the Macalloy Technotensioner, to ensure correct loads were applied to the structure.