Victoria Terminal 4, Belfast
Year of Completion 2007
The new state of the art Victoria Terminal (VT4) and docking facilities was supplied with large diameter Macalloy 17MHS tie rods, with additional factory wrapped Denso Tape & Denso PVC with 55% overlaps providing an effective corrosion protection system. Each tie rod complete with nut, washer and an anchorage plate provided an anchorage for tubular piled anchor walls.
With approximately 300 tie rods being supplied in diameters M105, M100, M90 & M76 tie rods installation commenced in Spring 2007 and is due to be supplied and installed by November 2007.
Main Contractor - McLauglin and Harvey
Piling Contractor - Pierse Contracting Ltd